SSDG Project 2010 | Net Metering | Grid Code | Tariff | Downloads | Payments | Contact Us

Renewable Energy Projects >> SSDG Project 2010 >> Grid Code

The Grid Code sets out all the requirements relevant to the performance, operation, testing, safety, and maintenance of distributed generation connected to CEBís low voltage (LV) network. Furthermore, it defines the rights, responsibilities and conduct of all parties planning to access the power system by producing electricity on renewable Small Scale Distributed Generators. Download the Grid Code